This project involved installing a dedicated load management system for two electric vehicle chargers to help monitor and control electrical demand. The works included installing a MODBUS meter with CT clamps at the main switchboard, providing a separate enclosure for the client-supplied load management system and installing data cabling between the main switchboard and the upstairs data rack.
Installation of a load management system for two EV chargers, including a MODBUS meter, CT clamps, enclosure and data cabling.
| Project Detail | Specification |
|---|---|
| Load Management System | Installation of a client-supplied load management system for 2 EV car chargers. |
| MODBUS Metering | Installation of a MODBUS meter with CT clamps at the main switchboard. |
| LMS Enclosure | Supply and installation of a separate enclosure next to the switchboard to house the client-supplied load management system. |
| Data Cabling | Installation of a data cable from the main switchboard to the upstairs data rack. |