Hertz – Site: 105 York Street, South Melbourne

Commercial EV Charger Installation in Basement Car Park

This project involved the installation of five client-supplied electric vehicle chargers on Basement Level 1, with each unit connected back to the existing basement switchboard. New RCD protection was installed within lockable, weatherproof four-pole enclosures at the charger locations, along with an IP66-rated enclosure near the switchboard. The works also included the installation of wheel stops and protective bollards, rerouting the data cable for Charger 1 to a new Ethernet switch, and supplying and installing six new data cables between the switch and the charger locations to provide reliable network connectivity across the charging system.

Commercial EV Charger Installation in Basement Car Park

This commercial EV charger installation delivered a complete charging solution for a basement car park, including five client-supplied chargers connected to the existing switchboard. The project also included new RCD protection, weatherproof enclosures, Ethernet data cabling, wheel stops and protective bollards to create a safe, reliable and connected electric vehicle charging system.

Scope Item Details
EV Charger Installation Installation of 5 client-supplied EV car chargers on Basement Level 1.
RCD Protection Supply and installation of new RCDs within lockable, weatherproof 4-pole enclosures at the charger locations.
Electrical Connection Wire the chargers back to the existing switchboard within the basement.
Wheel Stops and Bollards Supply and installation of wheel stops and protective bollards as required.
Weatherproof Enclosure Supply and installation of an IP66-rated weatherproof enclosure near the switchboard.
Charger 1 Data Cable Reroute the Charger 1 data cable to the new Ethernet switch.
Data Cabling Supply and installation of 6 data cables from the Ethernet switch to the charger locations.